View Single Post
  #14  
Old 07-17-2012, 09:40 AM
Vetterodder com Vetterodder com is offline
Member
 
Join Date: Jun 2012
Location: Boynton Beach, FL
Posts: 50
Thanks: 0
Thanked 0 Times in 0 Posts
Default


Here is my C6 Street Shop Chassis after it has been removed from the jig. I can see that more gussets, the side pipe / brake line tabs are now installed as well as the front sway bar mounts. At this point, the chassis fabrication is completed. Bolts will be placed in anything on the frame that has threads in preparation for powder coating in the next week or so.
What’s next?
I have contracted Street Shop to build the complete rolling chassis as many of you have seen the extensive list of parts at the beginning of the thread. All the parts have been ordered a few weeks ago so I will assume that many have already arrived or will be arriving while the chassis is off to powder coat so that when it returns to the shop, the assembly process will begin.




Reply With Quote