View Single Post
  #16  
Old 04-23-2014, 09:35 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,642
Thanks: 504
Thanked 1,077 Times in 385 Posts
Default

When I stopped by this morning on my way out of town --- half the trades in the valley were at the shop working.... LOL



Okay -- Well I knew you'd all be waiting -- so after a 10 hour drive.... I'll post up the photos of the paint going on - and the new sheetrock in the upstairs area.


THE BLUE will be painted MAT BLACK.... but one thing at a time okay!?!?












The lower part of this wall -- get's 10' high (tall) corrugated steel floor to to the 10' mark...












Sheetrock going on upstairs AND the storage loft area walls painted...






















The new shop doors are on order -- and they'll be 2" thick insulated --- and at the 10' level they'll have glass for some natural light.... They'll be overhead doors == not these roll ups -- but will still have side mounted motors.














So just in case you forgot here's a BEFORE PAINT pic.....





Reply With Quote