![]() |
Well it was a really crappy day weather wise, but they got the house roof done. They got here at 7 am and finnished at 1:30. They stripped it put water and ice protection and shingled, put new ridge roof vent and capped it. They only did the house. My contractor is doing the garage roof and the tie in to the house. When he gets ready to shingle the garage he will put the three 14" Velux sun tunnels in . One into the house to bring some light in where we removed the window in the dining room and the other two will be in the garage near the back side close to the house.
Here are some pictures from today. Starting the stripping. http://i172.photobucket.com/albums/w...ingon002-1.jpg All stripped and water and ice protection going on. http://i172.photobucket.com/albums/w...goingon004.jpg 30lb felt paper and shingles going on http://i172.photobucket.com/albums/w...goingon015.jpg Caps and sealing around chimney http://i172.photobucket.com/albums/w...goingon019.jpg And the finnished roof. The parts that aren't done is where he is going to tie in the garage roof. http://i172.photobucket.com/albums/w...goingon020.jpg Its getting exciting now for sure, I can't wait until the roof is all tied in and water tight. |
Eeeeeeeeeeeeehhhhhhhhhhhhhhhhhhaaaaaaaaaaa!!!!
You Go Girl!! :d |
Looking good Wayne! :woot:
|
Looks great Wayne.:thumbsup:
Man, I give those roofers some mad respect, especially after today's weather. It was WICKED. Cold, raw and very windy.:mad: |
Thanks guys .... It was as cold as a witches T$& in an igloo today! But I'm not the brightest bulb on the tree either. I was out there all day with them. Passing them stuff so they didn't have to climb all the way down the ladder.
|
That's because you're one of the good guys. I'm sure they appreciated it.:cheers:
|
Greg came over today and finnished up the trusses that tie into the house roof. The'll be back tomorrow to put the plywood on so the roofing contractor can come Saturday to finnish tieing the house roof to the garage . They will do the high peak . The rest of the garage will be done by my contractor. They'll be making a closed valley by weaving the shingles together.
Here's a couple pictures from today.They opened up the roof and cut off the rafter tails so the last full size truss could be set against the house. http://i172.photobucket.com/albums/w...ingup002-1.jpg http://i172.photobucket.com/albums/w...ingup003-2.jpg This is the last of the long trusses tied into the rafters http://i172.photobucket.com/albums/w...ingup004-2.jpg http://i172.photobucket.com/albums/w...goingin002.jpg http://i172.photobucket.com/albums/w...goingin001.jpg |
Nice progress!! :thumbsup:
|
Moving right along Wayne. Good deal!:thumbsup:
|
I took my life in my hands for these pictures !
They got the rest of the plywood on the roof today. I also had them put my Velux sun tunnel flashing in so the roofers can finnish the rest of the roofing tomorrow. It was a beautiful day so I took a little flight to get these pictures.
If you notice any shaking its me not the lift. lol http://i172.photobucket.com/albums/w...ingin001-1.jpg http://i172.photobucket.com/albums/w...goingin005.jpg birds eye view http://i172.photobucket.com/albums/w...goingin009.jpg http://i172.photobucket.com/albums/w...ingin008-1.jpg http://i172.photobucket.com/albums/w...ingin011-1.jpg http://i172.photobucket.com/albums/w...goingin007.jpg Here's the crew building the garage. http://i172.photobucket.com/albums/w...goingin003.jpg http://i172.photobucket.com/albums/w...tunnels001.jpg Here's an idea how it looked from up there. This is the highest point in the city. http://i172.photobucket.com/albums/w...goingin010.jpg Those houses are three deckers. I don't get a warm fuzzy feeling looking at that gutter on that house. |
| All times are GMT -7. The time now is 10:43 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net