Thanks Ric,Tony and Rich! I'm so happy with what these guys did. They flew on this job, and not by cutting any corners either. The biggest hold up was me not wanting to take a chance pouring the floor on a chance of rain day. I'm very happy with them.
Rich the car looks kick ass! |
Mondays progress. We worked on the bay window today it was almost impossible to open it had sagged so much in the twenty years its been there. We jacked it up and tightened the cables that hold it plus we shimmed the braces that are under it. It works fine now. ( I forgot how easy it opened. ) Then we trimmed it out with Azek pvc board ( no more painting. ).
Next they removed the bay window in the garage and installed the door. I didn't get pictures of the install, I was at the doctors. I had to take them later on . Sorry for the pictures taken in the dark but here they are. http://i172.photobucket.com/albums/w...sMonday001.jpg This is from in the garage side. Tomorrow we get stairs. The hole you see to the right of the door was so we could get to the out let to move the wire without disturbing the plaster. http://i172.photobucket.com/albums/w...sMonday002.jpg Now from in the house. I still need to insulate and blue board and get someone to skimcoat it. I also have to rewire the outlet on the left . It was connected to the one on the right. I was all set to do it but only had 14/2 and its wired with 12/2. That was a surpirse. http://i172.photobucket.com/albums/w...sMonday003.jpg http://i172.photobucket.com/albums/w...sMonday004.jpg I just got intouch with my plumber. He will come next Monday and move the radiator which is infront of the door. I called two door installers to get prices to install my garage door. I talked to both last week and neither got back to me with a price yet. One said he would call me Sat. to come see it on Sunday morning. Nothing from him yet. |
Quote:
|
Looking great! Almost there!! Wish I lived closer, we could have that patch next to the door ready for paint by lunch! You have to be WAY excited!! :thumbsup:
|
Hell yes I'm excited!! The punch list is dwindling . I wish you wee close too. I have to find someone to skimcoat it for me. I have a buddy who knows someone who can do it. Just have to get intouch with them. Its funny My wife hasn't said anything about getting it done. But my daughter wants to have my grandaughters birthday party here on the 4th so she's driving me nuts to get it done.
Northeast Rod Run I may leave it so they can't find me when I'm in there. |
Very cool Wayne.
Better get it before your granddaughter's birthday party.:_paranoid (Just playing.) It's looking really good.:thumbsup: |
Wow man! That looks great. I know you are pumped. I hear the garage calling......camaro...camaro...I need a camaro :D
|
Thanks Tony and Jay but thats me mumbling in my sleep you hear!!! lol
They got a little more done today. They installed all the huricane clips and finnished the bottom of the front door trim. They also built the stairs in the garage. They did a great job on them. There very rigid. the treads are made from 2x10s Here are a couplee of pictures. http://i172.photobucket.com/albums/w...tairs001-1.jpg http://i172.photobucket.com/albums/w...tairs003-1.jpg |
I know it was a slow and somewhat stressful start to this, but look at it now!! You clearly hired the best contractor! They are doing a great job for ya!! :thumbsup:
|
I had a little progress yesterday. The plumber came by to remove a 6' section of base board so the door into the garage could be finnished so it could open. I gave him a hand , we started at 8:30 am it was out and plumbed back in by 12:00. Then the fun began we tried to bleed the system. My water pressure is almost non existent. It took forever to fill the system. Then to bleed the air out was fun. We had to do three zones 3 times each. One zone has two kick board heaters, they held so much air it was a pain. The plumber who did the baseboard replaced the kick panel heater in the kitchen a few years ago. When he did he put ball valves on either end so we used them to finally get it bled but it was 3:30 when we finnished. Another 3 hours of extras I didn't count on. But thats how it goes. Atleast its done.
Here's where we removed the baseboard. http://i172.photobucket.com/albums/w...ures/002-2.jpg http://i172.photobucket.com/albums/w...ures/001-2.jpg |