Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Project Updates (https://www.lateral-g.net/forums/forumdisplay.php?f=16)
-   -   "BLACK WIDOW" 68 Firebird MetalWorks Pro-Touring build (https://www.lateral-g.net/forums/showthread.php?t=51392)

Mikael A 12-31-2016 04:59 AM

Very nice i love it.

MetalWorksClassics 01-10-2017 02:07 PM

Firewall
 
4 Attachment(s)
Painting the firewall in satin black.

MetalWorksClassics 01-20-2017 04:24 PM

Front stub
 
8 Attachment(s)
Installing the front stub and sheet metal.

anguilla1980 01-20-2017 06:07 PM

Looking great! Wow she's come along way. Can't wait to see her through!

MetalWorksClassics 02-06-2017 10:42 AM

Thanks...yeah it has definitely come a long way since arriving at the shop.

Quote:

Originally Posted by anguilla1980 (Post 652850)
Looking great! Wow she's come along way. Can't wait to see her through!


MetalWorksClassics 02-15-2017 08:30 AM

Stripes
 
10 Attachment(s)
Laying out and prepping the stripes for paint.

gofastwclass 02-15-2017 08:16 PM

I like that you are carrying the stripe around the bend to terminate in the door jamb instead of simply painting across the gap. Another subtle detail often missed.

MetalWorksClassics 02-20-2017 03:45 PM

Stripe paint
 
10 Attachment(s)
Laid down the stripe work paint.

Zoomin 02-20-2017 03:54 PM

Nice!!!

Mikael A 02-20-2017 04:48 PM

Very nice :thumbsup: :thumbsup: :thumbsup:


All times are GMT -7. The time now is 07:43 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net