![]() |
Texas Standing Mile :drive:
|
i hope to have NoGo as a full roller with the engine sitting in place...i think its pretty ambitious...but i hope i can get it there!
|
LOTS of car plans!
1st off is going to be new wheels. then would like to get roll cage done and do something with the interior! :thumbsup: MERRY CHRISTMAS!!! Paul |
18"wheels for the front....new interior.....OD transmission.......that should do it for now...:D
|
First...get my 11 second timeslip(motor)...super close....12.04 at 112.3
Then... hyd roller cam switch pitch TH400 Nitrous kit finish interior narrower front tires...rub |
Actually pull my long awaited 36 ford 3 window out of storage and get that thing togther enough to cruise. OH sorry wrong forum. But it does have a stack injection also.
Rodger |
Finish 7 LS7 engine projects in Jan
Finish 1968 Corvette Convertible Finish 1971 Cutlass "LSX455" Finish Jake's TT 509 67 Chevelle Finish Honda Civic Hatch Finish 1967 Ford TT Boss Custom 500, Run 9.9 1/4, drive it on Power Tour Texas Mile in my TT Ultima GTR Finish 1981 Twin Turbo Trans Am in time for SEMA |
Get the GTO done for columbus 08 or get it done for SEMA and let jeff schwartz and others see what ive created.
Get a job working for Jim wangers Move to southern california get a house and thats about it. |
Plans for Car (Lateral - 1)
================================ Minor Projects (2) (2008 Completion) 1) Complete Pro-Touring Street Modifications Have Renderings Made First: Get Mark VIII cooling Fan on car! Second: Put ATS Spindles On Third: Put Wilwood Superlight 6 pot Brakes on Car Fourth: Re-size Kinesis Front Wheels, Buy Tires, Install Drive Hell Out of It and Enjoy! ================================ 2) Work on Alternate Vintage, "Trans Am", look and hopefully Complete Have Renderings Made Fifth: Pick up Vintage Wheel Works #48's Six: Install Adjustable Rear Spoiler Seven: Buy and Install Adjustable Front Spoiler Eight: Have Removable Signs, Numbers, Sponsors, Etc. made Nine: Change Exhaust to fit look Drive Hell Out of It and Enjoy! ================================ Major Projects (Work on All Year) Sort out and plan Front Subframe/Frame and get ordered Sort out, plan, and upgrade 4 Point RollBar to 8--10 Point Roll Cage Get installation time planned, and Finish Project When not in the Shop, Drive Hell Out of It and Enjoy! ================================ Long Term Plan (for Next Year Completion 2009) Complete Any Remaining Projects of 2008 Decide on and plan purchase of, LS2 or LS7 Engine build Start saving $$$ Decide on Builder Finish Saving $$$ Get Engine Purchased and Installed Tune Entire Car, so All Major Components Work Together Definitely, Drive Hell Out of It! ================================ Work on and Complete Esthetics (2010 Completion) Alter Renderings if Necessary. Build Interior, Plan and install incidentals, Paint Exterior Drive Hell out of Car, and Enjoy it! ================================ Planned Specific Activities (For Next 3 Years) Take Driving Lessons Run Open Track Days Run Auto X Days Run the Drags Run Power Tour Run Texas Mile ================================ Next Project?? Ty O'Neal |
finish the 79 malibu...
finish the 65 mustang finish the 66 impala SS finish the 32 roadster finish the boat finish the cb750 cafe racer realistically... just finishing one of the above hopefully two will make for a good year |
| All times are GMT -7. The time now is 02:00 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net