Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Project Updates (https://www.lateral-g.net/forums/forumdisplay.php?f=16)
-   -   Pro-Street to Pro-Touring...MetalWorks 55 build (https://www.lateral-g.net/forums/showthread.php?t=52825)

jy211 05-04-2016 04:52 AM

keep the pix coming! I love shoeboxes!:bump:

MetalWorksClassics 05-05-2016 02:58 PM

Acid dip
 
9 Attachment(s)
The 55 is back from our acid dipping facility...ground zero.

Prepping for epoxy.

Zoomin 05-05-2016 05:51 PM

Man, ya gotta be happy with that!

Dave Pratt 05-06-2016 12:39 AM

You just have to love the 55...I'll be watching this one...git er' dunn

MetalWorksClassics 05-06-2016 04:07 PM

Jig table
 
6 Attachment(s)
Setting the 55 on the jig table to make sure it's square before we start cutting on it.

MetalWorksClassics 05-09-2016 03:53 PM

Metal work begins
 
8 Attachment(s)
Starting to patch up some of the rust in the body after bracing the body.

Soft section of the drivers side rocker was in need of replacing.

MetalWorksClassics 05-13-2016 09:37 AM

Metal work
 
10 Attachment(s)
Metal work is getting serious now...we ordered up a new "one piece" floor section and got busy with that as well as replacing the cowl corners, firewall, toe boards, trunk floor, etc.

waynieZ 05-13-2016 08:38 PM

You guys are moving along nice. Great build.

MetalWorksClassics 05-16-2016 09:06 AM

Thanks a lot, yeah things are moving along nicely...


Quote:

Originally Posted by waynieZ (Post 637521)
You guys are moving along nice. Great build.


MetalWorksClassics 05-18-2016 04:31 PM

Metal work and floor replacement continues
 
10 Attachment(s)
Cut, weld, repeat....


All times are GMT -7. The time now is 08:51 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net