![]() |
keep the pix coming! I love shoeboxes!:bump:
|
Acid dip
9 Attachment(s)
The 55 is back from our acid dipping facility...ground zero.
Prepping for epoxy. |
Man, ya gotta be happy with that!
|
You just have to love the 55...I'll be watching this one...git er' dunn
|
Jig table
6 Attachment(s)
Setting the 55 on the jig table to make sure it's square before we start cutting on it.
|
Metal work begins
8 Attachment(s)
Starting to patch up some of the rust in the body after bracing the body.
Soft section of the drivers side rocker was in need of replacing. |
Metal work
10 Attachment(s)
Metal work is getting serious now...we ordered up a new "one piece" floor section and got busy with that as well as replacing the cowl corners, firewall, toe boards, trunk floor, etc.
|
You guys are moving along nice. Great build.
|
Thanks a lot, yeah things are moving along nicely...
Quote:
|
Metal work and floor replacement continues
10 Attachment(s)
Cut, weld, repeat....
|
All times are GMT -7. The time now is 08:51 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net