![]() |
Thanks for the kudos Dave!
I agree completely with your statements about fueling. The fuel requirements of today are not the same as your grandfather's Chevrolet. Mayhem was a bit of a challenge with the dual ZL1 fuel modules, but the use of a Hobb's switch to control when the second fuel module is activated (still using PWM) cured some of the hurdles. The VaporWorx control system can handle three ZL1 fuel modules @ 100% DC from a power standpoint, so if you really want to crank it up...... Another method to control the relay would be to use the output from an aftermarket ECM that sent a signal at a specific MAP setting. This would work for aftermarket ECM's. I don't believe GM ECM's have this capability. |
| All times are GMT -7. The time now is 12:26 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net