![]() |
I'll just guess at 26
|
23 is my guess
|
Depending on the machine... and how it writes the program but I'll go with 1988.
-Matt |
I am going to guess 428
|
I would guess 18 operations or less if we exclude coating but include finish prep prior to coating.
NOTE: Are we going to include finish and coating? You might have five operations for coating alone. Both can go in and out of the bath together so do coating operations count as one for both or double? |
14
I hope they bolt onto a 4th gen X-body |
speedtech upper arms...
I guess 840 for both.
|
I am going to say 50 total.
|
23 passes
|
210 :rockin:
|
My guess, 469
|
My guess is 74 for the pair :rolleyes:
|
ok I'll guess 21 [ 22 is taken]
|
i'll take 180
|
im guessing 34
|
I have no clue... but i say 10 :P :lol:
|
Geminifour 40
|
9 machining steps ( threading, surface flatning, drilling & main shaft designe)
|
I say 32.
|
I'll guess 48 for the pair.
Scott |
Im going to say 12 steps for a complete set.
|
10 operations is my guess
10 operations
4 machining each 1 polish each 10 total !!!!! |
809!
Hope im not too late! |
Speedtech a arm guess
36 operations to machine
|
I will say 30 operations
|
I'm guessing 40
|
638 :_paranoid
|
475! For the win!
|
Who is the winner????
Well Scott today is the 1st and lookin here to find out :)
It had better be me...........Scott do ya hear me........... Scott???? Chris Even if its not me Ill have to say congrats top the winner. Even if its not me. :thumbsup: |
Sorry Chris, the long Holiday weekend has messed me up. lol
The winner is Musclerodz. See the beginning of this thread for the details. :thumbsup: |
Quote:
Chris |
OK musclerodz I dont know if you have a second gen but I do, so how much do you want for them?
|
KICK A$$!!! I finally one one! Nope don't have a second gen, but I I have always wanted one. I guess its a start! :thumbsup:
Mike |
| All times are GMT -7. The time now is 05:37 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net