![]() |
Love this stuff -- WAY KOOL and not OLD SKOOL!
:>) |
Quote:
|
Test pressure
Quote:
|
Backing up a bit
Well i found some of the other pics i had taken so i'm going to back up a bit for a few posts.Heres a shot of us checking and aline honing the main saddles to the housing size we like to see this is one of the first things we do once we know the block is soundhttp://www.nelsonracingengines.com/l...9-ls-build.jpg
|
Aline Honing
http://www.nelsonracingengines.com/l...1-ls-build.jpg
aline honing it.This basically is a long bar with alinement shoes and cutting stones that we run threw the main saddles to size the hole that we want it to be it also puts a finish on the surface that allows the bearings to transfer heat into the block correctly.Which if you get right will increase the bearing wear |
Cleaning of the block
http://www.nelsonracingengines.com/l...3-ls-build.jpg
Again you can never be to clean here we are doing one of the five cleaning process the block will go threw before final assembly.We like to run brushs threw all the galley holes to make sure weve got all the dirt and grit for the final we will do a full soap and water with high pressure and do a laquer thinner and white rags on the cyl walls untill the rag is white when you wipe it. |
Measuring the crankshaft
I like to check every rod journal and main journal at 90/180/270 and 360 degrees i also will check the journal side to side for taper bell mouth etc.All these numbers are recorded then we torque the bearings in there saddles for the rods and mains and transfer the mic number we got on the rod pin or crank pin and check that particular journal to see what kind of running clearance we have if it is not in the spec we need we will not go any futher until this is fixed.http://www.nelsonracingengines.com/l...6-ls-build.jpg
|
Checking Running Clearance
|
Checking rod bearing clearance
|
Getting ready for assembly
Once we no all the clearances,Stroker clear,rod bearing clearance,main bearing clearance,piston to wall,piston to pin,ring gaps,deck heights,rod side clearance,cam bearing holes have proper crush in there respective housings,Piston to valve,Piston to counterweight,piston to crank trigger etc.etc.etc.Then we are ready to start assembling the short block.As you can see we would need a zillion more pics to show it all .But here we are installing the crankhttp://www.nelsonracingengines.com/l...3-ls-build.jpg
|
| All times are GMT -7. The time now is 05:07 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net