![]() |
Little more progress..
got the rear bumper positioned and mounted http://www.trdv.ca/offroad/assorted/celica/bumper.jpg The steering all done, the crossmember notched for oil pan clearance, and the firewall cut and trimmed to be set way back, left side notched out for the side drafts.. http://www.trdv.ca/offroad/assorted/.../steering3.jpg http://www.trdv.ca/offroad/assorted/.../steering2.jpg http://www.trdv.ca/offroad/assorted/celica/steering.jpg |
|
|
|
|
Looks like alot of fun. I hope you finish soon so we can all see your vision in this thing.
|
I wanna know what'll look like too :D
Got the tranny in, and the Transmount/exhaust hole mocked in.. http://www.trdv.ca/offroad/assorted/celica/trans.jpg http://www.trdv.ca/offroad/assorted/celica/engine5.jpg And started the header... Here I cut the original manifold down to use as a template on my pantagraph, to make an official template. I cut out the holes in the thin guage material, then shaped the outside and the ports to be used in the pantagraph.... http://www.trdv.ca/offroad/assorted/celica/header.jpg Then put the template in and cut out the header plate.. http://www.trdv.ca/offroad/assorted/celica/header2.jpg |
|
Build notes:
Engine relocation= To Rear 6 1/2" Total time to date= 37 days Actual build time= Approx. 100 hrs Total cost to date (minus labour)= $1500.00 +/- $50 Actual joy and excitement= PRICELESS!!! :D |
Header Flanges
http://www.trdv.ca/offroad/assorted/celica/header7.jpg And the finished header with the finished muffler i made for it. http://www.trdv.ca/offroad/assorted/...er+muffler.jpg |
| All times are GMT -7. The time now is 06:13 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net