![]() |
Quote:
|
4 Attachment(s)
Drove out to see my car and fiddle today. Discussed rear seat arragements and front wheel size. Also tunnel thru middle of car. The goal is to leave the cage exposed and also the tunnel showing the bars, finished as brushed stainless. Final frame and cage should be done by years end.
Try not to get too attached to those 90's Vette wheels:lol: Thinking about colors and finishes. And still trying to figure out a catchy name for this build. Doug |
2 Attachment(s)
Set the motor in for the first time..
|
Looks great man! How did you correctly set up all the suspension geometry on your build? I havent got to that stage yet on mine
|
Quote:
The rear is set the same way. I have the rear subframe out of the 2010 Camaro still and we put a stock one in the air and took every measurement know to man... Hows your build coming along???? |
Awesome build you have going, I love the stainless tubing! I might have to ask for your opinions in the future when I get to the suspension if you dont mind. , Ive got the entire rear cradle and rails out of a c5 vette waiting for measurments and I should be able to either grab a front cradle from a friend or take measurements off another friends vette for the front suspension.
The biggest hold up for me right now is the jig, probably bit off alittle bit more then I can handle on it but, Im planning to do something about it this week or the next. I have had the car for exactly three years now and all I want to do is complete the jig, mount the body, engine, drivetrain, suspension, etc and Ill be ok for ahwile. Thanks for asking |
Quote:
|
I appreciate it! Keep the pics coming. So how much longer do you think you have in the project?
|
we need more shoebox builds :thumbsup:
|
Awesome build you have coming together! Look forward to watching this one.
|
| All times are GMT -7. The time now is 03:38 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net