Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Project Updates (https://www.lateral-g.net/forums/forumdisplay.php?f=16)
-   -   "BLACK WIDOW" 68 Firebird MetalWorks Pro-Touring build (https://www.lateral-g.net/forums/showthread.php?t=51392)

MetalWorksClassics 12-11-2015 04:38 PM

Getting ready for epoxy
 
10 Attachment(s)
Prepping the body for epoxy.

MetalWorksClassics 12-14-2015 01:49 PM

Epoxy
 
5 Attachment(s)
Coat of epoxy...

awr68 12-15-2015 01:58 PM

Nice and clean! Waiting on the new tail pan? What rear suspension?

MetalWorksClassics 12-15-2015 03:01 PM

Quote:

Originally Posted by awr68 (Post 624617)
Nice and clean! Waiting on the new tail pan? What rear suspension?

Thanks...the rear tail pan goes in next, then we will begin the mock up of the front and rear suspension...the rear setup is a 4 bar by Ridetech.

DOOM 12-16-2015 04:06 PM

Love when they get brought back from the dead!!!! Keep the updates coming.

waynieZ 12-17-2015 07:40 AM

It looks nice all epoxied, what are you using to prep the metal?

MetalWorksClassics 12-18-2015 02:44 PM

Quote:

Originally Posted by waynieZ (Post 624789)
It looks nice all epoxied, what are you using to prep the metal?

We scuff all the surfaces, then treat it with wax & grease remover, then do a final wipe down before shooting the epoxy.

MetalWorksClassics 12-21-2015 01:40 PM

Tail pan install
 
8 Attachment(s)
Here we are installing the new tail pan.

awr68 12-21-2015 03:08 PM

Looks like a car now! Metal on the car looks to fit well...that's always nice!

DKz Garage 12-21-2015 07:14 PM

Great to see the quality work going into this car....keep the updates coming!


All times are GMT -7. The time now is 02:27 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net