Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Man Caves (https://www.lateral-g.net/forums/forumdisplay.php?f=83)
-   -   Attached two stall Garage build (https://www.lateral-g.net/forums/showthread.php?t=28613)

awr68 10-28-2010 03:04 PM

:woot: This is awesome! Keep the pics coming! :woot:

waynieZ 10-28-2010 03:37 PM

Well we had a good day today got three of the four walls up. The only one not up is one that ties into the house its only eight feet long. Here are some more pictures of the progress.

http://i172.photobucket.com/albums/w...goingup009.jpg

http://i172.photobucket.com/albums/w...goingup010.jpg

http://i172.photobucket.com/albums/w...goingup018.jpg

http://i172.photobucket.com/albums/w...goingup015.jpg

http://i172.photobucket.com/albums/w...goingup016.jpg

And here's the guy who had the worst job of the day.

http://i172.photobucket.com/albums/w...goingup008.jpg

http://i172.photobucket.com/albums/w...goingup007.jpg

I drilled a hole in a 2x4 to help him by holding t he ground rod from bouncing all over the place. But still glad I didn't have to do it.
Tomorrow they will finnish the last wall and sheet it . We need an inspection from the electrical dept. Then he sends the ticket to the power company to inspect it . Then they put in for a demo permit from elec. co. Then they come to move the power wire to the temp service. I don't even want to think how long this deal is going to take. The top of the front wall is already touching the telephone wires and the power is only 3-4 feet higher.

rixtrix1 10-28-2010 04:30 PM

Cool Garage build
 
Looking better all the time!

awr68 10-28-2010 06:17 PM

Quote:

Originally Posted by waynieZ (Post 313516)

Good thing OSHA didn't drive by! Not that I haven't done worse! lol :_paranoid.

Looking real good! Looks like the weather is decent?

waynieZ 10-28-2010 07:16 PM

Tony SHHHHHHHHHHHHHH!:_paranoid The guy on the other side was just as high but on a shorter ladder.
When they started this morning it was raining but it cleared up by 9:30 and 75 degrees. Sunny tomorrow but the 70's went ba by.

67ragtp 10-29-2010 04:22 AM

looking good!!! Keep the pics coming :thumbsup:
Rich

waynieZ 10-29-2010 05:28 PM

They got all the siding up today. Here are some pictures of the progress.

http://i172.photobucket.com/albums/w...goingup007.jpg

http://i172.photobucket.com/albums/w...goingup009.jpg

http://i172.photobucket.com/albums/w...goingup010.jpg

http://i172.photobucket.com/albums/w...goingup014.jpg
The opening in the wall is for my through wall A/C unit..

http://i172.photobucket.com/albums/w...goingup013.jpg

http://i172.photobucket.com/albums/w.../siding002.jpg
Finnished sheating

http://i172.photobucket.com/albums/w.../siding001.jpg

http://i172.photobucket.com/albums/w.../siding003.jpg
Looking out the garage door from the front of the house.

These pictures are of the temp power we're hoping the elec. inspector passes so we can get a demo permit from the power co. Then they put you on the list to get it done. Any body in Ma have any pull with National Grid??? If this doesn't happen soon we will be dead in the water. The power is only 3-4' above the top of the front wall.

http://i172.photobucket.com/albums/w...goingup001.jpg

http://i172.photobucket.com/albums/w...goingup002.jpg

http://i172.photobucket.com/albums/w...goingup005.jpg

prostreet69cama 10-29-2010 08:30 PM

Looks great. It is coming along nice.

67ragtp 10-29-2010 08:50 PM

WOW!!! :wow: :wow: Thats what I call progress. looking good wayne.

tones2SS 10-30-2010 04:25 PM

Very nice Wayne. Making some serious haedway!:thumbsup: :cheers:


All times are GMT -7. The time now is 06:15 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net