![]() |
Lillard Mfg's new machine arrived today..
Mazak CNC center
|
Wow. That's a nice new toy. What are you going to make?
|
Right on Charlie.
Maybe someday I will buy one and put my ticket to use. Although I have probably forgotten how to even use it. Kevin |
good for Joe, that's great.
Jody |
Quote:
|
That's awesome! What does Joe primarily make?
|
The company I work for is waiting for there new 5-axis machine from CMS in italy. Thing wasn't cheap at $480k
|
Wow! Nice piece of equipment there!....Glad to see things are going well enough to warrant expansion...good news!:woot:
|
Doesnt he make the taillights and the other Billet pieces?
|
DAAAANNNGG!! Purdy! :D :thumbsup:
|
Quote:
|
Thank god you bought a MAZAK and not a pile of **** HAAS
|
Quote:
We've got 5 Haas machining Centers and haven't had a minutes problem with any of them............They are not in the Okuma zone, but are decent machines..............Just my $.02 Ken |
Quote:
a 1/2" end mill .250 deep cut in 6061 and can stall out a VF3 using and old 8N mazak (8hp 1991) lathe doing a 1/8" deep pass on a piece of mild steel theres only 60% lod on the motor so like 5.5HP, on the haas SL20(2007 22hp "vector drive"), I have 96% load with the exact same cut, material and insert SFM and feed 22hp motors my ass! There like a honda's NO TORQUE |
Nice, I think you should make everyone here something kool.:D
SW |
He makes everything from EFI boxes, motorcycle parts, wakeboard racks to Billet taillights. He is geared more toward mass production more that one off type stuff.
|
Quote:
Chris |
Quote:
Depends if you have the High Speed Spindle set up which takes bottom end torque away.......All our Haas do "Not" have High Speed spindles and have the Bigger Motor Options.....Just got a VF-6 with 30 H.P. and thru Spindle coolant options.....we were Drilling a 1" hole thru 3/4 stainless in 7 seconds per hole....Pretty Cool........Heres a link showing one of our Okuma's Hard Milling 60Rc D-2 ..........Technology is Cool......... http://i13.photobucket.com/albums/a2...MOV07963-1.jpg Hard to Imagine Hard Milling a part like this 5 years ago.......We used to spend 2 hours grinding each part..........machined 24 parts and stayed within .0002........Crazy... Didn't mean to Hijack the thread Charley.......... Ken |
| All times are GMT -7. The time now is 02:10 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net