Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Artwork and Collectibles (https://www.lateral-g.net/forums/forumdisplay.php?f=49)
-   -   Nova render (https://www.lateral-g.net/forums/showthread.php?t=12140)

Flying Scotsman 11-20-2007 07:39 PM

Nova render
 
Hi all.
Thought i'd put up a couple of renders done for a member of
The actual car is being built towards Christmas this year.
He wanted a kind of street/strip look with the 'eleanor' paint scheme (with the chevy stripes of course!). I'm looking forward to seeing how the physical vehicle turns out. Its my first 'comission' piece so its going to be cool to see the actual vehicle and the render come together. :)
Let me know what you think, critique welcome!
cheers
:thumbsup:
Chris

http://i109.photobucket.com/albums/n...Finall1RGB.jpg

http://i109.photobucket.com/albums/n.../Final2rgb.jpg

novanutcase 11-20-2007 09:08 PM

Cool.....

John

ZVT 11-21-2007 08:18 AM

:thumbsup: Awesome stuff!!!I would say maybe just define the door line more on the rear side shot other than that:hail: :thumbsup:

how long did it take to render?

Studio max or Rhino?

nasttee 11-21-2007 02:10 PM

amazing car and work:yes:

XcYZ 11-22-2007 07:55 AM

That looks great. :cheers:

notorious1970 11-22-2007 05:35 PM

Looks cool. Keep the look clean and it will be awesome. When is the proposed date to have this one on the road?
-derek

krptonite 11-22-2007 05:41 PM

OMG!! that car is gonna be badass!!! great work on the rendering too:thumbsup:

DVierstra 11-23-2007 04:04 PM

Keep up the great work. I really like the rims. Unique.

-DV

Flying Scotsman 11-24-2007 12:25 AM

Quote:

Originally Posted by ZVT
:thumbsup: Awesome stuff!!!I would say maybe just define the door line more on the rear side shot other than that:hail: :thumbsup:

how long did it take to render?

Studio max or Rhino?

Rhino -

Flying Scotsman 11-24-2007 12:26 AM

Quote:

Originally Posted by notorious1970
Looks cool. Keep the look clean and it will be awesome. When is the proposed date to have this one on the road?
-derek

Not sure on the final date, he said the build will be in full swing in about two or three weeks.

Thanks for the comments guys! :thumbsup:


All times are GMT -5. The time now is 11:12 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net