Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Project Updates (https://www.lateral-g.net/forums/forumdisplay.php?f=16)
-   -   Project update 57 T-Bird (https://www.lateral-g.net/forums/showthread.php?t=15620)

whyard 1 07-14-2008 01:57 PM

Project update 57 T-Bird
 
3 Attachment(s)
Getting close to installing interior. Hope to be rolling soon.....


All times are GMT -5. The time now is 11:24 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net