![]() |
Operation rust never sleeps
Phase one of the bodywork is done. Money is all used up for now. Pretty much everything in black was replaced. Car has martz chassis front and rear suspensions in it also. Check out the link below.
http://www.fquick.com/spott |
| All times are GMT -7. The time now is 05:10 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net