spinning assembly done.
 
Got the bottom end put together today...everything went perfectly.

Lunati Promod 6.125" rods.
JE pistons with floating pins retained by wire locks.
Eagle 4340 non-twist crank (very nice piece by the way).

Speed Pro rings .018 on the top ring .012 on the bottom.

I probably should have gone about .002 more on each ring, but I didn't.

I'm betting the motor it will be Ok. :_paranoid

Here was the scene in my life today:http://threestar40.home.mindspring.c...mbly%20001.jpg

http://threestar40.home.mindspring.c...mbly%20004.jpg

Tomorrow, more progress.

Rick :lateral:

slow4dr 09-26-2005 12:28 PM

Quote:

Originally Posted by threestar40
Got the bottom end put together today...everything went perfectly.

Lunati Promod 6.125" rods.
JE pistons with floating pins retained by wire locks.
Eagle 4340 non-twist crank (very nice piece by the way).

Speed Pro rings .018 on the top ring .012 on the bottom.

I probably should have gone about .002 more on each ring, but I didn't.

I'm betting the motor it will be Ok.

Here was the scene in my life today
Tomorrow, more progress.

Rick :lateral:


:thumbsup: Thanks for the update Rick!

:yes:

XcYZ 09-26-2005 04:05 PM

Progress. :thumbsup:

lil427z 09-26-2005 07:14 PM

rick .keep up the good work . :thumbsup:
rick kirkindall

hotwheels 10-23-2005 09:30 AM

that look's awesome.........