![]() |
68 Camaro Rebuild
4 Attachment(s)
Spent the last couple months working on the engine rebuild. Finally got it all wrapped up and dropped the drive train in over the weekend.
Were slowly getting her rebuilt. Once we do a quick engine firing its back to fixing the doors and assemble the front end. |
Looks sharp :thumbsup:
|
WicKeD! :thumbsup:
|
| All times are GMT -7. The time now is 09:46 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net