![]() |
My rear suspension installation and frame mods...
Here's few pics of my Guldstrand 5-bar installation,
http://finnshark.com/gallery/images/2847.jpg Here's how much is required to remove to make the upper control arm clear the frame. I could have just made a bulge shape patch to gover up that, but I like to do things the hard way... http://finnshark.com/gallery/images/3029.jpg Hole big enough for ya? Notice the shape how we did the cutting. It'll give us much stronger welds that way. |
http://finnshark.com/gallery/images/3032.jpg
Time to cover up that nasty hole. Here you see how much I widened the frame above the trailing arm pockets. Now I get all the clearance I need. http://finnshark.com/gallery/images/3033.jpg The sides also required a lot of attention to make them right (I had to do both sides exactly the same ). Two different pieces went to each side, it's much easier to get it into right shape with seperate pieces. http://finnshark.com/gallery/images/3048.jpg Here's the frame rail in 99% final form, still needs some buffing to smooth it out. It's super strong now, it clears the 5-bar, looks ok so I say mission accomplished! http://finnshark.com/gallery/images/3047.jpg http://finnshark.com/gallery/images/3045.jpg Two more shots to show some of the details... |
|
looks good, what kind of welder are you using?
|
All times are GMT -5. The time now is 12:07 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net