Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Paint and Body (https://www.lateral-g.net/forums/forumdisplay.php?f=52)
-   -   Northern orange county help (https://www.lateral-g.net/forums/showthread.php?t=31787)

clay69camaro 05-05-2011 01:16 PM

Northern orange county help
 
Is there anyone in the north orange county who has performed some body panel replacement who wouldn't mind helping a new guy out? I replaced my floorboard but i'm not confident enough in my skills in whole panel replacement.

I don't expect anyone who can help to do the work for me, i'm just looking for a bit of hands on guidance. I plan on doing the roof, quarters, tail panel, door skins... Pretty much firewall back.

I have the car pretty well stripped and the roof is about to come off next.

Thanks
Clay

clay69camaro 05-09-2011 05:21 PM

I'm thinking.... would beer sweeten the pot?

:cheers:

67zo6Camaro 05-09-2011 05:33 PM

What is your time-line looking like. I may be able to stop by from time to time to help guide you. I'm in the Long Beach State area.

Brett


Quote:

Originally Posted by clay69camaro (Post 346301)
Is there anyone in the north orange county who has performed some body panel replacement who wouldn't mind helping a new guy out? I replaced my floorboard but i'm not confident enough in my skills in whole panel replacement.

I don't expect anyone who can help to do the work for me, i'm just looking for a bit of hands on guidance. I plan on doing the roof, quarters, tail panel, door skins... Pretty much firewall back.

I have the car pretty well stripped and the roof is about to come off next.

Thanks
Clay


clay69camaro 05-09-2011 11:46 PM

Monday in school till 7
Tuesday, If I work it's till 6
Wednesday in school all day
Thursday, If I work it's till 6
Friday and Saturday, If I work it's till 6

I have quite a lot of free time, most weekends are open and nights.

67zo6Camaro 05-10-2011 01:11 PM

Sorry... I was asking for when do you plan to get this work completed (soon, next month....next year)?

Pm me here or email me at [email protected] and I will stop by to help direct you when you are ready.

Brett

clay69camaro 05-10-2011 10:18 PM

Quote:

Originally Posted by 67zo6Camaro (Post 347103)
Sorry... I was asking for when do you plan to get this work completed (soon, next month....next year)?

Pm me here or email me at [email protected] and I will stop by to help direct you when you are ready.

Brett

Ohhh haha, I'd like to have the sheet metal complete by the end of summer (wishful thinking) or by the end of the year (reasonable time frame)

I will PM you when I'm closer to the install phase, and check your availability.

Clay


All times are GMT -5. The time now is 02:53 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net