Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Paint and Body (https://www.lateral-g.net/forums/forumdisplay.php?f=52)
-   -   2nd Gen DSE Mini tub/ frame connectors.. (https://www.lateral-g.net/forums/showthread.php?t=33248)

Streetking 08-17-2011 08:41 PM

2nd Gen DSE Mini tub/ frame connectors..
 
Anyone know how long it takes to install the DSE mini tubs, subframe connectors & quadralink in a 2nd Gen?

syborg tt 08-18-2011 08:15 AM

Quote:

Originally Posted by Streetking (Post 365801)
Anyone know how long it takes to install the DSE mini tubs, subframe connectors & quadralink in a 2nd Gen?

Hi SW

Dan over at Holohan Hot Rods gave me this info about a year ago.
1185-C Gateway Drive
Mooresville, NC 28115
(704) 450-0607

http://holohanshotrods.com/

Not sure if there many shops better them him.

Mini-Tubs 40-45 Hours
Subframe Connectors - 20 Hours
Quadra-Link - 40-45 Hours

Musclerodz 08-18-2011 05:37 PM

Ditto what Marty said, first one took us little over 100 hours not including subframe connectors. 2nd gen quadralink is a bit more involved than a first gen

Streetking 08-18-2011 06:56 PM

Thanks guys...

syborg tt 08-19-2011 09:38 AM

your welcome


All times are GMT -5. The time now is 10:31 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net