Lateral-g Forums

Lateral-g Forums (https://www.lateral-g.net/forums/index.php)
-   Open Discussion (https://www.lateral-g.net/forums/forumdisplay.php?f=14)
-   -   Got 10 minutes? 5 axis milling an engine block from scratch. (https://www.lateral-g.net/forums/showthread.php?t=8564)

Ummgawa 03-11-2007 04:00 PM

Got 10 minutes? 5 axis milling an engine block from scratch.
 
Amazing, must be a Formula One engine.

https://www.youtube.com/watch?v=QsmiIeAkE-o

rocketrod 03-11-2007 04:14 PM

WOW! I wonder how long it takes to do a block from start to finish, how many lines of code and how much for the finished product?

CraigMorrison 03-11-2007 05:09 PM

Quote:

Originally Posted by rocketrod
WOW! I wonder how long it takes to do a block from start to finish, how many lines of code and how much for the finished product?

1)A long time
2)A lot
3)A lot

Very cool vid :thumbsup:

GBodyGMachine 03-11-2007 08:04 PM

Thats really cool

Jeff

BThibodeaux 03-11-2007 08:23 PM

Yes,
Truely amazing! Beats the crap out of waiting the year and a half I have been waiting for World Products to get their Merlin X block cast. However I am sure a machined version would be a bit more pricey. Thanks.


All times are GMT -7. The time now is 02:45 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net