Thread
:
Project Dusterbd
View Single Post
#
4
07-09-2007, 07:19 PM
Nevis
Member
Join Date: Jan 2007
Location: Toronto Ontario
Posts: 21
Thanks: 0
Thanked 0 Times in 0 Posts
I put the front knuckes, balljoints, tie rods and sleeves and hub/rotor assembly on this week, will put calipers on soon.
__________________
Project Name
: "Dusterbd"
Vehicle
: 1970 Plymouth Duster
Engine
: Small block 340, forged rods and pistons, stock crank, iron chrysler performance heads.
Drivetrain
: Built 904 transmission, hurst quarter stick shifter, 3500 stall converter, 8 3/4 quarter rear end, auburn pro series limited slip with 4.10 gears. Rollin on 20's
Nevis
View Public Profile
Find all posts by Nevis