View Single Post
  #1  
Old 07-23-2007, 08:24 AM
68protouring454's Avatar
68protouring454 68protouring454 is offline
Senior Member
 
Join Date: Jul 2004
Posts: 1,593
Thanks: 0
Thanked 1 Time in 1 Post
Default JimHamptons 69 vert

Hey just wanted to post some pics of the project we just finished at Jakes Rod Shop. we installed a dse quadralink, welded brackets on axle, hand made custom tailpipes to work with stock gas tank and quadralink, installed longer rear axle studs, installed new eradi speed 2 pc front rotors, and did a general nut and bolt of the car for safety and reliability.
The car is complete, has the speed 3 front kit and it just goes so smoothly, everything works together as a system, it is a pleasure to drive and i really did not want to bring it back to him!

Shot with FinePix S3000 at 2007-07-23

Shot with FinePix S3000 at 2007-07-23

Shot with FinePix S3000 at 2007-07-23
Reply With Quote