Starting Backbone
Well, it's been way to long guys....
Started fabbing up the center backbone portion of the chassis. Had to build up the front sections of the exhaust to get final measurements for the tunnel width. 2 exhaust tubes at 2.5 plus two chassis tubes of 1.5 plus some space on both sides. Some 2.5 straight pieces, four 45s, two 90s and two 2.5 header flanges. (All from Summit for $200)
I plan to wrap the entire exhaust and add some heat shielding in the tunnel.
Also bent up a chassis tube to see how it fit in. Front a-arm attachment tabs will hopefully come in this week from the waterjet guys. Been waiting a month - but the holidays slow everyone down I guess.
Jim
|