View Single Post
  #4  
Old 04-11-2008, 03:02 PM
scherp69's Avatar
scherp69 scherp69 is offline
Lateral-g Supporting Member
 
Join Date: Dec 2007
Location: British Columbia, Canada
Posts: 882
Thanks: 0
Thanked 4 Times in 2 Posts
Default

Quote:
Originally Posted by ProdigyCustoms View Post
That is one sexy set up. But dont tell people it only take 4 hours, we have been charging 8hrs! LOL! Seriously, looks killer with the M9 and backbrace. Glad to know the G Bar ready rear made it easy
That's good point Frank. In fairness to you and all the other shops that install these, I don't want people to think 'hey it only took him 4 hours, why am I getting charged more'. It took me 4 hours to install just the housing and suspension parts. I haven't put in the axles, centre section, brakes, brake lines, etc. Also, I didn't have to remove anything as my car is just a shell right now and everything has already been removed. It would definately take alot longer than 4 hours to install everything and have it ready to drive. I was just trying to give some hope to those that do decide to take on the challenge themselves.
__________________
Mike

Pro Touring 68 Acadian(Nova)
Speedtech subframe with high clearance control arms
Prodigy Bar rear suspension
Ridetech single adjustable coilovers
Wilwood 12.2" brakes
New Gen Splitters
LS3 and TKO600

Link to my build: https://lateral-g.net/forums/showthread.php4?t=14349


Last edited by scherp69; 04-11-2008 at 03:04 PM.
Reply With Quote