Quote:
Originally Posted by rich-allen
These parts are new in the box.
Classic Auto Air
DSE Wiper kit
DSE battery relocation Kit
Synister serpentine kit
Ron Davis radiator
Hydroboost
Fuel lines, fittings ect.
T56 trans
Mcleod clutch pressure plate ect
ATS mounts
Fully built LS2
FAST ignition system
Gauges, console
Install interior (interior already done.)
Fabrication work being done by ironworks:
Smooth firewall
Sub frame connectors
Mini Tub
Bend / install brake lines
I've done a lot of work to the car including the front and rear suspension and fixed a lot of things the previous owner butchered.
Rodger said they could complete everything in about 90 days before I decided to tub it.
Some shops would keep your car for more than a year with less work than this.
Rich
|
Rich, that's a nice parts list for sure.
I'm gonna send you a PM.