View Single Post
  #2  
Old 10-02-2008, 04:29 PM
James OLC's Avatar
James OLC James OLC is offline
Senior Member
 
Join Date: Jan 2006
Location: Calgary, AB
Posts: 1,459
Thanks: 0
Thanked 1 Time in 1 Post
Default

Quote:
Originally Posted by 70 chevelle View Post
How long till the electrical system is live? I would love to know your opinion on the system once it's running. I have been looking at it for a while but I'm a little eeeery about facing the gremlins, if any. very interesting system.
It should be powered up tomorrow or Saturday at the latest. The real world caught up with me a bit this week and I wasn't able to put in the time that I wanted on the wiring but change tomorrow.

One of the many things that I like about the ISIS System is that, if anything, the gremlins will be easier to deal with given the systems smart diagnositic capabilities. One of the other things that I like is that the switching side into the Mastercell is via grounds and not hot wires. Saves some wear and tear on switches and eliminates a bunch of hot wires under the dash.

I'll keep you posted when we start running power to some of the loads.
__________________
James
1967 Camaro RS - The OLC
1967 Camaro RS - Recycler
1969 Camaro - Dusty
Reply With Quote