View Single Post
  #8  
Old 10-20-2008, 08:26 PM
gearhead1186's Avatar
gearhead1186 gearhead1186 is offline
Senior Member
 
Join Date: Dec 2007
Location: NY
Posts: 114
Thanks: 0
Thanked 0 Times in 0 Posts
Default

I definitely plan on a fuel tank from ricks hot rod and 18x12 wheels in the rear. Given that the tank can be made to your specs is it necessary to have the tank pre-frame/floor construction. Also given a wheel width and backspacing, is it necessary to have the actual parts on hand?

Besides having a flat firewall and trans tunnel(4l80e) fabbed up what else would be necessary for the front end?
Reply With Quote