View Single Post
  #33  
Old 10-21-2008, 10:27 AM
Teetoe_Jones Teetoe_Jones is offline
Senior Member
 
Join Date: Jul 2004
Location: La La Land, CA
Posts: 856
Thanks: 0
Thanked 9 Times in 7 Posts
Default

Back to the lower control arms, we TIG weld the spacer into one side of the double shear mount; the other side gets a zinc plated floater.







The lower mount is ready to be welded to the lower control arm pocket:



The arms are fully welded; TIG around the brackets, and MIG in the center to plug weld them in place. Now they go off to get re-finished.



Next we will assemble your AFX spindles using the LG Motorsports brake cooling ducts. I'll post those up when the parts arrive.

Tyler
Reply With Quote