View Single Post
  #13  
Old 03-10-2009, 08:22 PM
GT500KR_Vert's Avatar
GT500KR_Vert GT500KR_Vert is offline
Member
 
Join Date: Jun 2007
Location: Maryland
Posts: 64
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Update:
I've been busy this last 1.5 years getting another degree, a stressful job and commute, wife/kids, work around the house; so I let the car sit. I kept talking to people about good guys to work with and I found someone a while back. I also had to find and buy little parts that were lost when I got my car back. That took a while because some of them were original mustang parts that are hard to find. Now I'm getting back to the project. I let it sit too long, a little surface rust developed. Going back over the car today I noticed a bunch of things the previous guy did wrong while working on it. I also had to remove all the little items he didn't bother to take off before he sprayed it with primer (besides the rust he sprayed right over) like the ignition & headlight switches, the covertible top switch, little screws on the interior, pieces of the dashboard, washer pump, a sheetmetal screw he used to hold a panel in place while he welded it, the door handles and locks. So it's finally stripped.

One of the biggest problems the last two days has been trying to figure out all the little nuts and bolts that were lost by the last builder and replacing them while installing the rear and front suspension and getting it rolling again. I had to bring it home on carpet dollies. I had a few trips to the local auto store to get that fixed.

Anyway I organized all my parts, boxed up the one needed for the next phase of the project.

Next Phase:
* Finish MII suspension
* Install the engine
* Create a custom trans mount
* Install subframe connectors
* Install 3" Magnaflow exhaust
* Modify Total Control's X-brace to fit with a custom vert support bracing.
* Finish the sheet metal for the engine compartment
* Order custom Ron Davis radiator - the original Ron Davis one i ordered did not fit.
* Mount Radiator
* Spray rust preventer on the Interior(Non-Visible), inside doors, engine compartment, underbody, and any other hidden spot I can shoot.
* Then paint the engine compartment black.
* Paint the underbody with bedliner coating
* Finalize rear suspension
* Install Dynamat
* Install Wiring
* Install Brakes / Plumbing
* Install Fuel system

At this point the engine should be in, exhaust in, wiring in, trans in, suspension in, brakes in, fuel system in, and the car drivable.

The next step will be to find a body shop to repair minor issues, prep and paint the car.

Finally back on all 4 wheels, load with all the parts to go to the new builder, and ready to roll!
I'm so excited to take another step towards it's completion. So are my little boys, they "Helped" today and yesterday with little things like tightening bolts and helping use the air impact. Plus it's been like 20 degrees outside.
__________________
1968 Shelby GT500KR Vert
CarDomain: http://www.cardomain.com/ride/2576876

Last edited by GT500KR_Vert; 03-10-2009 at 08:41 PM.
Reply With Quote