Thread
:
Project "ItDoRun" - Phase Two
View Single Post
#
24
03-29-2009, 07:36 PM
ItDoRun
Senior Member
Join Date: Jun 2006
Location: Zachary, Louisiana
Posts: 921
Thanks: 0
Thanked 1 Time in 1 Post
It's been several weeks since I made any progress on the car, so after a pep talk with wife earlier this week, she got me motivated to get back out in the shop and get moving again. So after trial fitting the passenger side quarter, outer wheel house, and tail panel about 10 times, I decided to go ahead and weld the tub and outer wheelhouse in the car. I also modified the trunk hinge support brackets and got them fitted and ready to weld. Today, I epoxy primed the entire trunk area and the outer wheel house. Here's a few pictures. Quarter panel and tail panel installation is on the agenda next.
__________________
Chris
1968 Camaro: DSE tubs and sub frame connectors, Chassisworks G-Link rear suspension, Speedtech upper and lower control arms, Chicane front coilover conversion with QA1's, Baer brakes, 18" Forgeline SO3's, Vintage Air, 6.0L LS 417 rwhp, 4L65E, Moser 12 Bolt w/3.73's....
http://www.cardomain.com/ride/2391864
Build Thread:
https://lateral-g.net/forums/showthread.php4?t=19253
ItDoRun
View Public Profile
Find all posts by ItDoRun