View Single Post
  #271  
Old 04-29-2009, 06:22 PM
Flash68's Avatar
Flash68 Flash68 is offline
Moderator
 
Join Date: Sep 2005
Location: NorCal
Posts: 9,180
Thanks: 58
Thanked 158 Times in 104 Posts
Default update

Well all the parts from Holley are in now. New rails and FPR. Should be bolted on in the next day.

FAST EFI getting hooked up and final wiring figured out. Apparently there are 3 wires that aren't marked and no one is quite sure where they go or what they do. Instructions are not helping either.

All 4 wheels should be powdercoated and installed.

Exhaust should be done tmrw... the Stainless Works X-pipe was too wide to make work well without cutting it down so much or having to run a near S-pipe to connect to the collectors and then mufflers. So Jason had a stainless Magnaflow X-pipe at the shop that he used instead that fits mucho better.

Not sure if the IC plumbing will be done by Saturday (not mandatory obviously) but it looks good for a Saturday fire up! You think I am excited?
__________________
2004 NASA AIX Mustang LS2 #14
1964 Lincoln Continental
2014 4 tap Keezer

Last edited by Flash68; 04-29-2009 at 06:25 PM.
Reply With Quote