Thread: Overhaulin'
View Single Post
  #16  
Old 09-04-2009, 07:20 AM
Steve1968LS2's Avatar
Steve1968LS2 Steve1968LS2 is offline
Moderator
 
Join Date: Feb 2005
Location: Anaheim Hills, CA
Posts: 5,534
Thanks: 0
Thanked 4 Times in 2 Posts
Default

The TV build does take a week but often times they spend WEEKS after the build finishing stuff up, making stuff work, and tweeking.

Considering the time frame the quality is good although I've heard of a few mechanical issues.

The owner is 1099'd for the value of the parts. They found away around billing them for the labor, but the free build ends up costing quite a bit. Still, I wouldn't turn it down.
__________________
"A ship in port is safe, but that's not what ships are built for."

See Bad Penny run the cones: https://www.youtube.com/watch?v=8GUPPIX-92U

1971 Chevelle Wagon - Roadster Shop Chassis ProCharged Shafiroff LS and lots of yada yada

1968 Camaro - Project Track Rat - 440 RHS LS
Reply With Quote