
05-15-2010, 08:32 PM
|
 |
Senior Member
|
|
Join Date: Jan 2008
Location: Huntington Beach, Ca
Posts: 773
Thanks: 0
Thanked 0 Times in 0 Posts
|
|
Then the work started on the body. Again because of the dropped height, raised motor, and proper drive shaft angles, I had to make multiple changes. I thought that I was going to be able to get away with cutting a little out of the tranny tunnel for the tremec, but it turned out to be a whole lot more than that. I started by cutting out the entire tranny tunnel, and fabbing up a new piece that fit over the tranny once the proper angles were established. I then welded it in, and continued by cutting out the entire driveshaft tunnel. The driveshaft was about 1” away from the stock tunnel at ride height, so it was raised a good amount. I was originally going to leave it all spot welded, but I ended up solid welding it with all the welds ground down and finished. I was amazed at how much more rigid the floor was with the added height of the tunnel acting as a backbone.
|