So we made some real progress. I just proofed the sheetmetal story (article 4). The AMD panels went on really well and are easily worth the extra pennies.
After Michael welded up the body we had Bob work on the roof to quarter seems, wheel lips (We beaded the wheel lips) and smooth the drip rails. The drip rails are only roughed in, but for roughed in drip rails they look pretty damn good.
So this weekend I will do some sheetmetal closeout work on the rear suspension, finish the driveshaft tunnel, get it off the jig, install the subframe and throw some rollers on it. And then send it to John for the pre wire and pre plumb. John is excited to get to work on it and I am excited he gets to work on it, LOL!
Enjoy