View Single Post
  #12  
Old 09-28-2010, 04:55 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,491
Thanks: 939
Thanked 342 Times in 231 Posts
Default

The form contractor came this morning and stripped the footing and formed the walls. The survey guys came and shot the corners of the forms to be sure they were accordance with the variance. I'm so shell shocked from going for the variance I kept telling them not to square it towards the property line. I hope they listened. lol They were very good workers I got lucky with them.
Here are some pictures of what they did.





They had a nice rig for the forms. They used a dumpster hauler with a dumpster with the sides cut down . They drop it and unload it close to the ground. It felt weird, I was outside while they were placing the concrete. It started to rain a little so I went back in the house and just watched out the bay window nice and dry. It felt like I was doing something wrong because I used to do concrete work for a living.
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK
Reply With Quote