Not too much today they came back and stripped the walls. I also caulked a crack in the house foundation while it was accessable.
Here are a few pictures.




Here's a picture of the crack I filled.

Tomorrow the inspector come to look at the fooundation. If it passes we backfill and I install the conduit for the feed from the 200 amp garage panel to the 100 amp house panel. Because of the weather were going to get Friday, we'll have to wait until next week to pour the floor. Still not too bad for three days
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK
Reply With Quote