Things I got done recently:
1. Got the starter installed and the passenger side header installed tonight.
2. Located, drilled a hole and installed the fuel pressure regulator on the fenderwell.
3. Consolidated wiring around the battery to clean things up.
4. Installed the adaptor and the autometer temp sensor.
5. Installed the new temp switch for the electic fan.
6. Installed engine ground wire.
Things left to do.
1. Make and install power wire for electric fan.
2. Install alternator (coming soon, will be next major update with pictures)
3. Heater hoses (will probably show pics on this too)
4. Wire ignition controller
5. Reinstall fuel pump and fuel tank after cleaning them.
6. New throttle cable wire
7. Serpentine belt
8. Coolant plug for passenger side head
9. Oil filter and oil
10. Coolant
11. Get a fire extinguisher
12. Make some noise.
__________________
-Nathan
1970 Camaro RS. FOR SALE
2000 SS Camaro, 6-spd, SOLD
|