
12-17-2010, 06:53 PM
|
 |
Administrator
|
|
Join Date: Jul 2004
Location: Wilton, CA.
Posts: 13,475
Thanks: 7,718
Thanked 2,362 Times in 1,104 Posts
|
|
Quote:
Originally Posted by 1970camaroRS
Things I got done recently:
1. Got the starter installed and the passenger side header installed tonight.
2. Located, drilled a hole and installed the fuel pressure regulator on the fenderwell.
3. Consolidated wiring around the battery to clean things up.
4. Installed the adaptor and the autometer temp sensor.
5. Installed the new temp switch for the electic fan.
6. Installed engine ground wire.
Things left to do.
1. Make and install power wire for electric fan.
2. Install alternator (coming soon, will be next major update with pictures)
3. Heater hoses (will probably show pics on this too)
4. Wire ignition controller
5. Reinstall fuel pump and fuel tank after cleaning them.
6. New throttle cable wire
7. Serpentine belt
8. Coolant plug for passenger side head
9. Oil filter and oil
10. Coolant
11. Get a fire extinguisher
12. Make some noise.
|
Jody
|