Thread
:
RPM Hot Rods Presents Project Triple Nickel 69 Camaro Convertible
View Single Post
#
2
01-05-2011, 09:30 AM
c10addict
Senior Member
Join Date: Nov 2007
Location: Pittsburgh Pa
Posts: 192
Thanks: 0
Thanked 0 Times in 0 Posts
Here are some pictures with the floors cut out, floors going in, DSE Mini Tubs installed, DSE Subframe mocked in place and the insides of the rear wheel wells. We built the wheel lip all the way to the inside of the tub.. This is an area that often gets overlooked but drives us crazy when left unfinished!
__________________
RPM Hot Rods
Lower Louder Faster
Warrendale Pa.
www.rpm-hotrods.com
Last edited by c10addict; 01-05-2011 at
09:33 AM
.
c10addict
View Public Profile
Find all posts by c10addict