it will have the electric solenoid on it, they make it kit that when turned on will discharge and recharge the system as needed. i figured since its a little smaller than the 1/4 turn valve on it now that when i plumb it in after all the fab work is done i can replace it then.
and i already have a custom switch picked out to turn it on