Here's some weak old updates. I've been a little slow working the last few weeks. Was out of town for ten days, then sick, now my wife is in Africa for 10 days on a mission trip so I am pulling daddy duty 24/7 with the two kids.
I struggled with how and what to do for subframe connectors. Cause there were some issues that had to be addressed. The low ride height, not getting way up inside the car, and clearance under neath for everything else. I studied, and studied, I made parts, I made more parts, only to finally decide on something so simple a "cave man could do it". To keep it simple I simply used (2) pieces of 1 5/8" .120 wall DOM tubing that I seam welded together, then fired up the new CNC plasma and made some simple (4) bolt flanges , and got everything welded together. Car is now tied together, and the flanges still allow me to be able to remove the subframe, for painting and for any future things. The KISS principal at its finest (keep it simple stupid)!! I am making some simple weld on brackets to put on each end where is welded to give a little more weld area and kind of a double shear affect on the mounting locations
We are waiting on some parts to show up like trans, exhaust parts, and seats. Then I can start building and fabricating the floor structure and floors them selves. anyway on to the pictures