View Single Post
  #233  
Old 12-17-2011, 04:50 PM
ccracin's Avatar
ccracin ccracin is offline
Senior Member
 
Join Date: Sep 2006
Location: Rostraver, PA
Posts: 2,077
Thanks: 0
Thanked 4 Times in 4 Posts
Default More Parts!

We are still trying to get as much done under the dash as we can before we weld the new firewall on. Next up is the steering column and mount for the brake pedal. After a lot of measuring, what iffing, we got the bracket built. I decided that I wanted to incorporated the pedal mount anf steering column mount into one piece that could be fixed to the cowl area. This is the area that the factory bracket was fastened too. Here is what we cam up with. A couple more gussets on the pedal mount and I'll get the bracket welded in. Here it is so far.







As always comments good or bad are welcome.
__________________
Chad
Instagram - @cctek
https://https://www.facebook.com/CCTek

68 Chevy Pickup Project
Build Thread: https://lateral-g.net/forums/showthread.php4?t=7505

THANKS TO: A&M Machine and Fabrication, CCTek (http://www.candctek.com), Hermance Design(www.hermancedesign.com), Paradise Road Rod & Custom, Harry Opfer Welding, Wegner Automotive Research, Clayton Machine Works
Reply With Quote