View Single Post
  #30  
Old 01-09-2012, 05:38 AM
GaryBetsy GaryBetsy is offline
Member
 
Join Date: Oct 2011
Location: Hamilton, NJ
Posts: 25
Thanks: 0
Thanked 0 Times in 0 Posts
Default Project Updates and Pictures as of 1/9/12

Thanks SuperB70. We really like how this project is coming out so far as well. Here is the next set of build pictures. In this set you can see how and why we laid out the front tubing structure the way we did. It not only supports the front end sheet metal but also allows us to mount our radiator and duel transmission coolers that we are running in series. This will allow us to run the auto trans at the proper temp and not allow it to over heat or get sluggish. After welding the front structure together we weighed it in comparison to what was originally holding the front and sheet metal. Not only did we add tons of more strength but we shave 50 lbs. Take a look at this set of pictures and give us some feedback.
Attached Images
        
__________________
Gary Betsy
GB Performance Restorations
275 Rt. 156 Hamilton, Nj 08620
(609) 581-1800
Reply With Quote