Thread
:
Project "Eastbound" 1978 Trans Am
View Single Post
#
35
02-03-2012, 06:57 AM
Fitz78ta
Senior Member
Join Date: Jun 2010
Location: Missouri
Posts: 149
Thanks: 0
Thanked 0 Times in 0 Posts
417 got some more work done to the car. Through the floor subframe connectors are done along with the sway bars. The watts link is started, hopefully it will be done soon.
__________________
Project:
1978 Trans Am - Twin turbo Iron block 370 LS1
All fabrication done by 417 Motorsports
https://lateral-g.net/forums/showthread.php4?t=30588
Fitz78ta
View Public Profile
Find all posts by Fitz78ta