View Single Post
  #52  
Old 07-20-2012, 03:24 PM
toddshotrods's Avatar
toddshotrods toddshotrods is offline
Senior Member
 
Join Date: Jun 2005
Location: Columbus, OH
Posts: 504
Thanks: 0
Thanked 0 Times in 0 Posts
Default

One of the guys finished hammering the plates, so yesterday I welded the I-beam shifter mount up. Next come the rocker arm mounts, and hours and hours of grinding and shaping.







With that firmly underway, we've started on the floor-mount pedal assembly. More steel plate (mostly .250", purposely over-engineered for abuse tolerance), plasma cut, grind, grind, grind. We're using the pivots, and crank sections, of the Honda Accord brake pedals with our own foot lever sections. I was going to keep the ratio the same to keep the original feel, but Schism is so small that we need to reduce the overall size, so the effort will be increased a bit.

The funny-shaped (un-cut) piece is the main mounting plate. It will have a clevis that straddles the left front frame rail, and the little arm section will bolt to the front lateral main box frame section. The arms will be in clevises that extend up off the main plate. The slots are for the crank sections to reach down under the floor. They'll push rods extending back to rear mounted master cylinders, just behind the driver's seat. Access to them will be gained by flipping that seat up and opening an access panel. The ECU, fuses, etc, will located behind the passenger seat, and accessed the same way.
__________________
Todd Perkins Design
Reply With Quote