View Single Post
  #4  
Old 12-11-2012, 06:05 AM
will69camaro will69camaro is offline
Lateral-g Supporting Member
 
Join Date: Dec 2004
Location: Houston
Posts: 1,481
Thanks: 276
Thanked 189 Times in 103 Posts
Default

Well the car is out of my hands for now. Dropped it off at the paint shop yesterday and then took the subframe connectors, quadralink brackets and rearend to the chassis shop.

Paint shop
They're going to try and have the car in the first coat of primer by the end of the week. Blocking to start next week. In talking to him it looks like we'll hopefully stick to the 2-3 month expected duration. Discussed with him about a few additional touches (nothing serious, just small things like rolling the wheel wells) and he has a paid of 345/30/19s we're going to test fit and work with until we have room for them

Chassis shop
Painter is going to work with these guys and get the subframe installed and welded into the subframe connectors/car as soon as it arrives. They're going to install the rearend and bracketry and set it all up. They have a mock up engine/T56 that they will put in as I am planning to run the motor mounts that move the engine back ~1.5". This will give me more room up front for "accessories." While the car is with them they will also install the 6 point cage that now has been decided to just have removable rear bar, and fixed door bars. They're going to fab up a custom transmission crossmember as well that is welded into the car with just a bolted plate for the mount.

I'm excited and nervous. Hoping I can have the car DONE (painted and caged) by mid March. Lets hope these two guys can stick to their schedules!

William
Attached Images
  
__________________
Texas A&M BSME 2008
1969 Camaro - Hugger Orange
1969 C10 SWB - Hugger Orange
1992 Corvette ZR-1
2021 Ford F250 Tremor
Reply With Quote